Role program: Field Leadership
Foreman & Superintendent training for life science construction
Graduates can run crews inside an operating GMP facility without contamination or documentation failures, install and test hygienic systems right the first time, and produce the daily records that protect the company's entitlement.
Field Leadership
Build this program
Foreman & Superintendent
Up to 28 sessions (Superintendent 28, Foreman 23) • weekly 90-minute workshops
Graduates can run crews inside an operating GMP facility without contamination or documentation failures, install and test hygienic systems right the first time, and produce the daily records that protect the company's entitlement.
See all 28 lessons
GMP, records & change control
- GMP Basics for Construction Teams
- Good Documentation Practice (GDP / ALCOA+) for Field Records
- Change Control & Deviations on GMP Projects
- Notice Compliance & Contemporaneous Documentation
- Cleanroom Conduct, Gowning & Contamination Control During Construction
- RFI Forensic Tracking
Schedule
- Critical Path Method & Float
- P6 Logic Scrub, Schedule Health & Variance Reporting (Superintendent)
Labor & productivity
- Field Labor Tracking & MCAA Productivity Index
- MCAA Inefficiency Factors & Compounding
Procurement & coordination
- Subcontractor Management: Buyout, Scope Leveling & Performance (Superintendent)
Quality, piping & testing
- ASME B31.3 & B31.9 Walkdowns, Boundaries & Test Packages
- Pressure Testing SOPs & High-Pressure Field Safety
- ASME BPE Orbital Welding, Weld Logs & Borescope Inspection
- Slope, Drainability & Dead-Leg Verification
- Material Traceability: MTRs, Heat Numbers, Ra & Ferrite
- Clean Utilities: WFI, Purified Water, Clean Steam & Process Gases
- Cleaning, Passivation & Derouging Records
Facility systems & tie-ins
- Tie-ins & Shutdowns Inside an Operating Facility
- Cleanroom HVAC: ISO 14644 Classes, Pressure Cascades, HEPA & TAB
- BMS / EMS Controls & Data Integrity (Part 11 Awareness) (Superintendent)
- Containment, Biosafety Levels & Process Waste Systems
C&Q, turnover & closeout
- Putting C&Q Milestones into the P6 Schedule (Superintendent)
- Turnover Packages (TOPs) That Pass QA Review (Superintendent)
- Pre-Functional Testing Turnover & the CxA
- Punchlist Depletion Engines
Leadership & company standards
- Writing SOPs That Crews Actually Use
Capstone
- Capstone 1: Live Project Health Audit
Free: the LD Defense Kit
4 checklists that stop the most common causes of late mechanical turnover.