Train your team so the next job never needs rescuing.
One 90-minute workshop a week, built on real job files: P6 schedules, ASME test packages, GMP turnover, and contested change orders. Your team uses PRC templates on a live job from the first month.
The 12-Week Field Controls Accelerator
Twelve weekly workshops that give your team the controls habits that prevent late jobs, practiced on one of your live jobs from the first week. Here is what your team gets.
What your team gets
- 12 live workshops, 90 minutes each. On-site at your office or jobsite trailer, or live on Zoom or Teams.
- Your own job as the classroom. One active job audited live, so every lesson is used on real work.
- Critical path & P6. How to check a schedule update before you sign it.
- ASME hydro and pneumatic testing. Test packages that pass the first time.
- Six lessons picked for your work, such as GMP documentation, change control, or delay notices.
- The full PRC template library for every team member, each template with built-in instructions.
- A quiz after every session and a certificate for each person who passes.
- A monthly summary for leadership showing what the team learned and what it found on the job.
Bonuses
- Recordings of every session, so a missed week is never lost.
- The LD Defense Kit: four field checklists for the whole team.
- Your live job checked like a 72-Hour Project Rescue Assessment, so you see your current exposure.
Attend the first four sessions. If your team hasn’t used a PRC template on a live job by then, we refund the program.
Timmy teaches every workshop himself, so we train a limited number of teams at a time.
- Book a free 30-minute consultation. Tell us your roles and the problems you see.
- We pick the length, the role programs, and the live job your team will practice on.
- Workshops start weekly. Your team uses the templates on the job from week one.
Pricing is set in the consultation, after we understand your team.
12, 24, or 48 weekly workshops.
Every enrolled team member gets the full editable template library. On-site at your office or jobsite trailer, or live on Zoom or Teams. We tailor the program, and set pricing, in your free consultation.
Field stabilization
- For project engineers, field engineers, QA/QC inspectors
- Module 1: Critical path & P6
- Module 2: ASME hydro/pneumatic testing
- Plus 6 life science lessons you choose
- 1 active job audited live
- Standard forms suite • monthly summary
Project mastery
- For superintendents, project managers, lead QC managers
- Modules 1–4: P6, ASME testing, MCAA labor & claims, turnover
- Life science highlights: GMP, BPE welding, C&Q
- 2 active jobs audited live
- Standard + claims suite • bi-monthly governance
Operational excellence
- For the full project delivery team and senior operations
- All 10 modules, including advanced dispute forensics
- Custom corporate playbook
- Continuous quarterly audits
- Full enterprise suite + custom SOPs
Q1 • Weeks 1–12
CPM mechanics and the P6 logic scrub, ASME B31.3/B31.9 walkdowns and safe pressure testing, MCAA labor tracking, delay pricing, and claims.
Q2 • Weeks 13–24
Commissioning turnover and closeout, then the GMP environment: documentation practice, cleanroom conduct, change control, tie-ins, BPE welding, drainability, and material traceability.
Q3 • Weeks 25–36
Clean utilities and passivation, risk-based C&Q and IQ/OQ support, turnover packages, cleanroom HVAC, controls data integrity, then forensic schedule analysis and measured mile.
Q4 • Weeks 37–48
Cumulative impact claims, REA narratives, expert reports and settlement, your custom corporate playbook, and a capstone project health audit with executive presentation.
Role programs for life science project teams
The same field-tested workshops, packaged by role. Every team starts with a shared foundation (GMP basics, good documentation practice, change control and notice), then each role takes the lessons it needs. Open a program to see every lesson.
Operations Management, Project Executive & Director
Graduates can judge whether a life science job is healthy from the KPI dashboard and schedule summary, decide when to pursue or settle a claim, and install the company playbook.
See all 26 lessons
GMP, records & change control
- GMP Basics for Construction Teams
- Good Documentation Practice (GDP / ALCOA+) for Field Records
- Change Control & Deviations on GMP Projects
- Notice Compliance & Contemporaneous Documentation
Schedule
- Critical Path Method & Float
- Delay Classifications & the Law of Float
- Forensic Schedule Analysis Methods (AACE 29R-03)
Labor & productivity
- Field Labor Tracking & MCAA Productivity Index
Quality, piping & testing
- Pressure Testing SOPs & High-Pressure Field Safety (select roles)
C&Q, turnover & closeout
- Risk-Based C&Q (ASTM E2500 / ISPE Baseline Guide 5)
- Putting C&Q Milestones into the P6 Schedule
Financial: change, claims & billing
- Compounded Delay Pricing
- Neutralizing Liquidated Damages
- Cumulative Impact & Disruption Claims
- Building the REA / Claim Narrative & Entitlement Binder
- Negotiation, Mediation & Settlement Strategy
- Expert Reports, Depositions & Document Production (select roles)
Leadership & company standards
- Project Controls KPI Dashboard & Monthly Governance
- Estimating Feedback Loop: Productivity Benchmarks
- Corporate Post-Mortem & SOP Handoff
- Playbook Architecture: Turning Lessons into Company Standards
- Onboarding & Training Cadence: Field Controls Bench Strength
- Rollout, Audit & Continuous Improvement
- Business Development & Large-Project Capture
Capstone
- Capstone 1: Live Project Health Audit
- Capstone 2: Executive Recovery Presentation & Certification
Senior Project Manager, Project Manager & Assistant Project Manager
Graduates can run a life science job's schedule, labor, subcontracts, change, C&Q interface and turnover, protect entitlement as it happens, and build and defend a recovery or claim.
See all 39 lessons
GMP, records & change control
- GMP Basics for Construction Teams
- Good Documentation Practice (GDP / ALCOA+) for Field Records
- Change Control & Deviations on GMP Projects
- Notice Compliance & Contemporaneous Documentation
- RFI Forensic Tracking
Schedule
- Critical Path Method & Float
- P6 Logic Scrub, Schedule Health & Variance Reporting
- Delay Classifications & the Law of Float
- Building Defensible FragNets in P6 (PM & Senior PM)
- Forensic Schedule Analysis Methods (AACE 29R-03) (PM & Senior PM)
- Windows / Contemporaneous Period Analysis (PM & Senior PM)
Labor & productivity
- Field Labor Tracking & MCAA Productivity Index
- MCAA Inefficiency Factors & Compounding
- Measured Mile & Productivity Loss Quantification
Procurement & coordination
- Subcontractor Management: Buyout, Scope Leveling & Performance
- BIM / Detailing Coordination & Constructibility Review (PM & Senior PM)
Quality, piping & testing
- Material Traceability: MTRs, Heat Numbers, Ra & Ferrite
Facility systems & tie-ins
- Tie-ins & Shutdowns Inside an Operating Facility
C&Q, turnover & closeout
- Risk-Based C&Q (ASTM E2500 / ISPE Baseline Guide 5) (PM & Senior PM)
- Supporting IQ / OQ: What Validation Needs from the Contractor
- Putting C&Q Milestones into the P6 Schedule
- Turnover Packages (TOPs) That Pass QA Review
- Pre-Functional Testing Turnover & the CxA
- Punchlist Depletion Engines
Financial: change, claims & billing
- Meeting Minutes, Pay Applications & Invoice Processing (APM focus)
- Compounded Delay Pricing (PM & Senior PM)
- Neutralizing Liquidated Damages (PM & Senior PM)
- Retainage Release Operations
- Cumulative Impact & Disruption Claims
- Building the REA / Claim Narrative & Entitlement Binder
- Negotiation, Mediation & Settlement Strategy (PM & Senior PM)
- Expert Reports, Depositions & Document Production (Senior PM)
Leadership & company standards
- Project Controls KPI Dashboard & Monthly Governance
- Estimating Feedback Loop: Productivity Benchmarks (PM & Senior PM)
- Corporate Post-Mortem & SOP Handoff
- Playbook Architecture: Turning Lessons into Company Standards (Senior PM)
- Onboarding & Training Cadence: Field Controls Bench Strength (Senior PM)
Capstone
- Capstone 1: Live Project Health Audit
- Capstone 2: Executive Recovery Presentation & Certification (PM & Senior PM)
Project Engineer
Graduates can review design and detailing for hygienic constructibility, produce GMP-quality technical records the first time, support the CxA and validation team, and keep the technical data that the PM's schedule, changes and claims depend on.
See all 31 lessons
GMP, records & change control
- GMP Basics for Construction Teams
- Good Documentation Practice (GDP / ALCOA+) for Field Records
- Change Control & Deviations on GMP Projects
- Notice Compliance & Contemporaneous Documentation
- RFI Forensic Tracking
Schedule
- Critical Path Method & Float
Labor & productivity
- Field Labor Tracking & MCAA Productivity Index
- Measured Mile & Productivity Loss Quantification
Procurement & coordination
- BIM / Detailing Coordination & Constructibility Review
Quality, piping & testing
- ASME B31.3 & B31.9 Walkdowns, Boundaries & Test Packages
- Pressure Testing SOPs & High-Pressure Field Safety
- ASME BPE Orbital Welding, Weld Logs & Borescope Inspection
- Slope, Drainability & Dead-Leg Verification
- Material Traceability: MTRs, Heat Numbers, Ra & Ferrite
- Clean Utilities: WFI, Purified Water, Clean Steam & Process Gases
- Cleaning, Passivation & Derouging Records
Facility systems & tie-ins
- Tie-ins & Shutdowns Inside an Operating Facility
- Cleanroom HVAC: ISO 14644 Classes, Pressure Cascades, HEPA & TAB
- BMS / EMS Controls & Data Integrity (Part 11 Awareness)
- Containment, Biosafety Levels & Process Waste Systems
C&Q, turnover & closeout
- Risk-Based C&Q (ASTM E2500 / ISPE Baseline Guide 5)
- Supporting IQ / OQ: What Validation Needs from the Contractor
- Putting C&Q Milestones into the P6 Schedule (optional)
- Turnover Packages (TOPs) That Pass QA Review
- Pre-Functional Testing Turnover & the CxA
- Punchlist Depletion Engines
Financial: change, claims & billing
- Retainage Release Operations
- Cumulative Impact & Disruption Claims
- Building the REA / Claim Narrative & Entitlement Binder (optional)
Leadership & company standards
- Writing SOPs That Crews Actually Use
Capstone
- Capstone 1: Live Project Health Audit
Project Admin & Project Coordinator
Graduates can keep records that pass a GMP audit, run the logs and trackers the PM and PE depend on, and assemble turnover, closeout and document production packages.
See all 19 lessons
GMP, records & change control
- GMP Basics for Construction Teams
- Good Documentation Practice (GDP / ALCOA+) for Field Records
- Change Control & Deviations on GMP Projects
- Notice Compliance & Contemporaneous Documentation
- Cleanroom Conduct, Gowning & Contamination Control During Construction
- RFI Forensic Tracking
Schedule
- Critical Path Method & Float (optional)
Labor & productivity
- Field Labor Tracking & MCAA Productivity Index
Quality, piping & testing
- Material Traceability: MTRs, Heat Numbers, Ra & Ferrite
- Cleaning, Passivation & Derouging Records
C&Q, turnover & closeout
- Supporting IQ / OQ: What Validation Needs from the Contractor
- Turnover Packages (TOPs) That Pass QA Review
- Pre-Functional Testing Turnover & the CxA
- Punchlist Depletion Engines
Financial: change, claims & billing
- Meeting Minutes, Pay Applications & Invoice Processing
- Retainage Release Operations
- Expert Reports, Depositions & Document Production
Leadership & company standards
- Project Controls KPI Dashboard & Monthly Governance (optional)
- Writing SOPs That Crews Actually Use
Foreman & Superintendent
Graduates can run crews inside an operating GMP facility without contamination or documentation failures, install and test hygienic systems right the first time, and produce the daily records that protect the company's entitlement.
See all 28 lessons
GMP, records & change control
- GMP Basics for Construction Teams
- Good Documentation Practice (GDP / ALCOA+) for Field Records
- Change Control & Deviations on GMP Projects
- Notice Compliance & Contemporaneous Documentation
- Cleanroom Conduct, Gowning & Contamination Control During Construction
- RFI Forensic Tracking
Schedule
- Critical Path Method & Float
- P6 Logic Scrub, Schedule Health & Variance Reporting (Superintendent)
Labor & productivity
- Field Labor Tracking & MCAA Productivity Index
- MCAA Inefficiency Factors & Compounding
Procurement & coordination
- Subcontractor Management: Buyout, Scope Leveling & Performance (Superintendent)
Quality, piping & testing
- ASME B31.3 & B31.9 Walkdowns, Boundaries & Test Packages
- Pressure Testing SOPs & High-Pressure Field Safety
- ASME BPE Orbital Welding, Weld Logs & Borescope Inspection
- Slope, Drainability & Dead-Leg Verification
- Material Traceability: MTRs, Heat Numbers, Ra & Ferrite
- Clean Utilities: WFI, Purified Water, Clean Steam & Process Gases
- Cleaning, Passivation & Derouging Records
Facility systems & tie-ins
- Tie-ins & Shutdowns Inside an Operating Facility
- Cleanroom HVAC: ISO 14644 Classes, Pressure Cascades, HEPA & TAB
- BMS / EMS Controls & Data Integrity (Part 11 Awareness) (Superintendent)
- Containment, Biosafety Levels & Process Waste Systems
C&Q, turnover & closeout
- Putting C&Q Milestones into the P6 Schedule (Superintendent)
- Turnover Packages (TOPs) That Pass QA Review (Superintendent)
- Pre-Functional Testing Turnover & the CxA
- Punchlist Depletion Engines
Leadership & company standards
- Writing SOPs That Crews Actually Use
Capstone
- Capstone 1: Live Project Health Audit
Put the same tools on every job you run.
License the field-tested PRC template library: the intake, schedule, claims, QA/QC, and closeout tools we use on recovery engagements. Training teams get it included; companies can also license it on its own.
Schedule & delay suite
Project intake and forensic audit sheet, TIA FragNet memo, RFI delay and latency log, and notice of delay and daily log protocol.
Claims & change order suite
MCAA inefficiency substantiation sheet, daily crew productivity log, COR pricing and standby packet, and executive delay defense binder.
QA/QC & turnover suite
ASME B31.3/B31.9 test package register, pre-functional turnover and Cx interface register, and punchlist burn-down tracker.
Closeout & SOP suite
Retainage release and closeout gate audit, post-mortem estimating benchmark report, pressure testing SOP, and P6 schedule health checklist.
Only want the templates? Ask about licensing on its own →
Tell us the result you need. We build the program around it.
Clearing a stalled test package backlog, defending against liquidated damages, or getting your PMs running P6 on their own: in a free 30-minute consultation we pick the length, the roles, and the job your team will practice on.
Free: the LD Defense Kit
4 checklists that stop the most common causes of late mechanical turnover.