Project Engineer training for life science construction
Graduates can review design and detailing for hygienic constructibility, produce GMP-quality technical records the first time, support the CxA and validation team, and keep the technical data that the PM's schedule, changes and claims depend on.
Project Engineer
Graduates can review design and detailing for hygienic constructibility, produce GMP-quality technical records the first time, support the CxA and validation team, and keep the technical data that the PM's schedule, changes and claims depend on.
See all 31 lessons
GMP, records & change control
- GMP Basics for Construction Teams
- Good Documentation Practice (GDP / ALCOA+) for Field Records
- Change Control & Deviations on GMP Projects
- Notice Compliance & Contemporaneous Documentation
- RFI Forensic Tracking
Schedule
- Critical Path Method & Float
Labor & productivity
- Field Labor Tracking & MCAA Productivity Index
- Measured Mile & Productivity Loss Quantification
Procurement & coordination
- BIM / Detailing Coordination & Constructibility Review
Quality, piping & testing
- ASME B31.3 & B31.9 Walkdowns, Boundaries & Test Packages
- Pressure Testing SOPs & High-Pressure Field Safety
- ASME BPE Orbital Welding, Weld Logs & Borescope Inspection
- Slope, Drainability & Dead-Leg Verification
- Material Traceability: MTRs, Heat Numbers, Ra & Ferrite
- Clean Utilities: WFI, Purified Water, Clean Steam & Process Gases
- Cleaning, Passivation & Derouging Records
Facility systems & tie-ins
- Tie-ins & Shutdowns Inside an Operating Facility
- Cleanroom HVAC: ISO 14644 Classes, Pressure Cascades, HEPA & TAB
- BMS / EMS Controls & Data Integrity (Part 11 Awareness)
- Containment, Biosafety Levels & Process Waste Systems
C&Q, turnover & closeout
- Risk-Based C&Q (ASTM E2500 / ISPE Baseline Guide 5)
- Supporting IQ / OQ: What Validation Needs from the Contractor
- Putting C&Q Milestones into the P6 Schedule (optional)
- Turnover Packages (TOPs) That Pass QA Review
- Pre-Functional Testing Turnover & the CxA
- Punchlist Depletion Engines
Financial: change, claims & billing
- Retainage Release Operations
- Cumulative Impact & Disruption Claims
- Building the REA / Claim Narrative & Entitlement Binder (optional)
Leadership & company standards
- Writing SOPs That Crews Actually Use
Capstone
- Capstone 1: Live Project Health Audit
Free: the LD Defense Kit
4 checklists that stop the most common causes of late mechanical turnover.